• Reliable is your source for all your fabrication needs.

  • Thread Line Piping

    Details:

    • Pipe is gravity fed into measuring system, then roll cut to length and label is applied
    • Pipe is then gravity fed to Landis threading machines
    • Thread are cut to ANSI/ASTM B 1.20.1 then checked by ANSI standard ring gauges
    • PipeFit AS anaerobic thread sealant with Teflon is applied
    • Thread fittings are assembled to the pipe
    • Assembled Pipe is gravity fed to the PACE make on machine then hydraulically torqued to ANSI specifications
    • Line piping is separated by the number inclusive of all diameters then tied in easy to handle groups
    • Master bundles are color coded and marked with the line number contents
    • 2'-6' and under bagged pieces contents are marked, palletized, shrink wrapped, identified and color coded
  • Welding Piping

    Details:

    • Pipe is gravity fed into the N.A.P. Quick cut measuring system and cut to length
    • Pipe is labeled and color coded
    • Cut end is then flapper disc chambered, then gravity fed to PACE hydraulic roll groove machine
    • Groove depth and flare are checked with pipe tape in the case of galvanized pipe, then flaking is removed internally by die grinding and external removed by flapper disc
    • Galvanized pipe end is sprayed with cold galvanizing internally and externally
    • Pipe is then gravity fed to the N.A.P. Universal Welder
    • Outlets welded to galvanized pipe are galvanized cold sprayed
    • Weld coupons are removed, bagged and stored
    • Blast cannon removes all dust and dirt from inside of pipe
    • Welds are die penetrate and developer tested
    • Pipe is bundled by identification wrapped and color coded
  • Hangers

    Details:

    • Plain or Plated rod can be cut to length and assembled with fastener and ring
    • Hanger assemblies are grouped, tied and tagged by the identification number
    • Hangers are bagged, palletized, wrapper identified and color coded